#Fire truck cad drawing manuals
Gabriel Bincik, Supervisor, Engineering SurveysĮmail: technical manuals for City’s Green Infrastructure. James Phillips, Supervisor, Engineering SurveysĮmail: Horizontal and vertical control bench marks contact: Survey Contact List Data capture and surveying standards contact: Appendix 1 – City of Toronto CSRS Stations.To support integration under the regulation, the City prepared this guide to facilitate surveyors and other groups using the City’s horizontal control network to integrate your projects into NAD’83 CSRS. With the introduction of Ontario Regulation 216/10 under the Surveyors Act on June 7, 2010, plans registered or deposited with the registry office must be integrated in the North American Datum 1983 (NAD’83) in either the NAD’83 Adopted or the NAD’83 CSRS datum definition with the coordinates expressed in either the 3 Degree Modified Transverse Mercator or 6 Degree Universal Transverse Mercator projections. Engineering Surveys V8i Graphic Specification.Engineering Surveys Graphic Specification.These specifications define the level structure, cell designations, line styles, text and dimensioning styles required when submitting MicroStation design file and paper (plot) formats. Engineering Survey Standards for Consultants.These standard define project preparation, survey capture techniques, design methodology and deliverables. Surveying standards, graphic file specifications and NAD’83 CSRS integration.